Hoisting Trolley Cranes

The main point to be considered in lifting units is the selection of motors and gearboxes. Parameters such as the speed of your line, lifting height, crane usage intensity are important design inputs. Lifting units are generally produced as high type and can also be produced as low type for narrow roof December of buildings.

When designing a lifting unit, it is aimed to use the upper and side clearance (vertical clearance and side clearance) and the right and left hook approach distances (left and right hook approach) at the maximum level. In this way, the area where the crane can move (crane travel) is maximized.

With the powerful speed control devices on the electrical panels, the working speeds can be reduced and increased at certain rates. Thus, your work (assembly, shipment, etc.) allows you to do your work comfortably by adjusting the speed according to the situation.

Wimac Crane also offers lifting unit solutions for all your new demands or old cranes. Considering the building dimensions and your requests, you can contact our technical department to evaluate the most suitable choice for you.

Standard Features

1. Double Bridge Girder
2. End Carriage Unit for Bridge Travelling
3. Crane Trolley
4. Hook Block
5. Electrical Panel and Electrical Installation
6. Walking Path
7. Wired Control (Pendant) and Wired Control Line (Pendant Track)
8. Wireless Control
9. Festoon System

Usage Area

1. Industrial manufacturing plants

2. Mining industry

3. Foundry factories

4. Shipyards

5. Warehouses

6. Ports

7. Logistics Warehouses

8. Construction Industry

9. Construction Centers

10. Heavy Industry Areas

11. Maritime Sector/Shipyards

12. Timber Industry

13. Silos

Exclusive Engineering
Innovative Solutions
High Quality
24/7 Availability

Other Hoisting Trolley Crane Products